This project consists of a combined heat and power expansion into the existing plant utility system. A key factor to the success of this project is hinged upon the integration of an existing plant utilities system into the new system.
New online casinos real moneyThis project also included a Solar Turbines 5.5MW combustion turbine with heat recovery steam generator and a supplemental fired duct burner creating an additional 150,000 lb/hr of steam. A new packaged boiler was also installed to generate an additional 86,250 lb/hr of steam.
This project was executed alongside existing plant operations with key outages coordinated to facilitate no unplanned production outages.